What document does a mold remediation contractor (MRC) write that may contain standard operating procedures?

  1. Mold Work Plan

  2. Mold Assessment Report

  3. Mold Remediation Certification

  4. Mold Clearance Report

The correct answer is: Mold Work Plan

A Mold Work Plan is the correct choice because it serves as a comprehensive document outlining the approach and procedures for addressing mold remediation in a specific environment. This plan not only details the steps to be taken during the remediation process, such as containment, removal, and cleanup, but it also includes standard operating procedures (SOPs) that guide the contractor in executing the project safely and effectively. The inclusion of SOPs ensures that all actions taken during the remediation process follow established best practices and regulatory requirements, thereby minimizing risks to both the workers and the occupants of the space. The other documents listed typically serve different purposes. For example, a Mold Assessment Report summarizes the findings of a mold inspection, detailing the extent and type of mold present but does not include operational procedures for remediation. A Mold Remediation Certification is an acknowledgment that a contractor has completed a training program or met certain qualifications, but it does not outline how to perform remediation tasks. Lastly, a Mold Clearance Report confirms that the mitigation has been completed and that the area is safe for re-entry, but it also lacks any procedural content regarding the remediation process itself.